NSW Premier Gladys Berejiklian has unveiled the first new Sydney Growth Trains double deck passenger train. The new B-Sets are an upgrade of the current Waratahs and feature improved passenger information, lighting, comfort and safety.

IDA worked with TfNSW to develop a livery design that gives the B-Sets a fresh new look over the previous generation Waratah A-Sets. The new livery better supports the TfNSW brand by giving the train a cleaner, more modern appearance with the livery design linking the various window elements along the side of the train for a more consistent graphic.

24 new 8 car sets have been ordered with the first set now in the process of testing and commissioning. The first trains are due to go into service in mid-2018, with further roll outs continuing into early 2019.

https://www.smh.com.au/national/nsw/new-trains-finally-signal-end-to-sydney-s-sweat-sets-20180322-p4z5mf.html

Exterior01-Perspective-05Abr2018.jpg